Notice and timing
How delinquency is handled
Grace period after the due date
A dedicated this detail was not publicly posted. The official residential water-discontinuation procedure page linked from the current City site returned HTTP 403 in the native browser, and the accessible utility-billing page does not publish a fixed grace-day count or universal due-date rule.
Late-fee calculation
A dedicated this detail was not publicly posted. The current accessible Merced utility-billing page does not publish the 2026 late-fee percentage, fixed delinquency charge, returned-payment fee, or collection schedule. Customers should confirm the amount on the current statement or with Utility Billing at (209) 385-6841.
Disconnection timeline
A dedicated this detail was not publicly posted. Merced links a formal Procedure and Notice Requirements for Discontinuation of Residential Water Service for Nonpayment, but that official policy endpoint returned HTTP 403 in the native browser. The accessible billing page does not expose the minimum delinquency period, notice lead time, payment-plan window, or restoration timeline.